Groundwater

RAAF Base Williamtown Groundwater

2021-06-25T19:16:00+00:00

Opportunity Extensive environmental investigations at RAAF Base Williamtown commencing in 2014 identified per- and polyfluoroalkyl substances (PFAS) contamination in ground and surface water that migrated offsite, resulting in restrictions on [...]

RAAF Base Williamtown Groundwater2021-06-25T19:16:00+00:00

Full-scale PFAS removal to non-detect for New England electronics manufacturing firm

2021-06-25T19:17:15+00:00

Project highlights and product features Client needed to upgrade two existing groundwater pump and treat systems due to lowered PFOA standard. Upgraded systems needed to reach effluent target of non-detect for [...]

Full-scale PFAS removal to non-detect for New England electronics manufacturing firm2021-06-25T19:17:15+00:00

Full-scale treatment of 1,4-dioxane at fractured bedrock site

2021-06-25T19:18:09+00:00

Project highlights and product features Full-scale application designed to treat and reinject 80 to 100 gallons of groundwater per minute System treats a mixture of groundwater extracted from a series of [...]

Full-scale treatment of 1,4-dioxane at fractured bedrock site2021-06-25T19:18:09+00:00

Mobile treatment of 1,4-dioxane at fractured bedrock site

2021-06-25T19:18:35+00:00

Project highlights and product features Mobile treatment of chlorinated solvents and 1,4-dioxane at fractured bedrock remediation site in Massachusetts First synthetic media application for 1,4-dioxane in Massachusetts, placed in service in [...]

Mobile treatment of 1,4-dioxane at fractured bedrock site2021-06-25T19:18:35+00:00

Synthetic media treatment for 1,4-dioxane remediation site in Florida

2020-05-27T15:14:58+00:00

Project highlights and product features Full-scale application designed to treat groundwater from a large footprint remediation project System treats a mixture of groundwater extracted from source area and edge of plume [...]

Synthetic media treatment for 1,4-dioxane remediation site in Florida2020-05-27T15:14:58+00:00

Treating chlorinated solvents in groundwater with synthetic adsorbents

2020-05-27T15:14:18+00:00

Project highlights and product features Installed by ECT2’s parent company, design treats 20 to 30 gpm continuously from near saturation concentrations to ND @ at 5 ppb System has been operating [...]

Treating chlorinated solvents in groundwater with synthetic adsorbents2020-05-27T15:14:18+00:00