Groundwater

RAAF Base Williamtown Groundwater

2024-04-24T23:28:07+00:00

Treatment Objective < (0.07 ug/L PFOS + PFHxS) (0.56 ug/L PFOA) Waste Generated 124m3 Volume Treated To Date >2.5 Billion litres PFAS [...]

RAAF Base Williamtown Groundwater2024-04-24T23:28:07+00:00

Full-scale PFAS removal to non-detect for New England electronics manufacturing firm

2024-04-24T23:29:11+00:00

Project highlights and product features Client needed to upgrade two existing groundwater pump and treat systems due to lowered PFOA standard. Upgraded systems needed to reach effluent target of non-detect for [...]

Full-scale PFAS removal to non-detect for New England electronics manufacturing firm2024-04-24T23:29:11+00:00

Full-scale treatment of 1,4-dioxane at fractured bedrock site

2024-04-24T23:30:13+00:00

Project highlights and product features Full-scale application designed to treat and reinject 80 to 100 gallons of groundwater per minute System treats a mixture of groundwater extracted from a series of [...]

Full-scale treatment of 1,4-dioxane at fractured bedrock site2024-04-24T23:30:13+00:00

Mobile treatment of 1,4-dioxane at fractured bedrock site

2024-04-24T23:30:44+00:00

Project highlights and product features Mobile treatment of chlorinated solvents and 1,4-dioxane at fractured bedrock remediation site in Massachusetts First synthetic media application for 1,4-dioxane in Massachusetts, placed in service in [...]

Mobile treatment of 1,4-dioxane at fractured bedrock site2024-04-24T23:30:44+00:00

Synthetic media treatment for 1,4-dioxane remediation site in Florida

2024-04-24T23:31:12+00:00

Project highlights and product features Full-scale application designed to treat groundwater from a large footprint remediation project System treats a mixture of groundwater extracted from source area and edge of plume [...]

Synthetic media treatment for 1,4-dioxane remediation site in Florida2024-04-24T23:31:12+00:00

Treating chlorinated solvents in groundwater with synthetic adsorbents

2024-04-24T23:31:42+00:00

Project highlights and product features Installed by ECT2’s parent company, design treats 20 to 30 gpm continuously from near saturation concentrations to ND @ at 5 ppb System has been operating [...]

Treating chlorinated solvents in groundwater with synthetic adsorbents2024-04-24T23:31:42+00:00
Go to Top