Environmental Remediation

Eielson Air Force Base – Alaska

2024-04-24T23:24:27+00:00

Opportunity Eielson Air Force Base near Fairbanks, Alaska experienced an unplanned release of 30,000 gallons of wastewater containing concentrated PFAS, and the Air Force Civil Engineer Center sought a system [...]

Eielson Air Force Base – Alaska2024-04-24T23:24:27+00:00

RAAF Base Tindal, NT Australia

2024-04-24T23:27:07+00:00

Treatment Objective > (0.07 ug/L PFOS + PFHxS) (0.56 ug/L PFOA) Waste Generated 37m3 Volume Treated To Date >2.5 billion litres Treatment [...]

RAAF Base Tindal, NT Australia2024-04-24T23:27:07+00:00

RAAF Base Williamtown Moors Drain

2024-04-24T23:27:37+00:00

Treatment Objective < (0.07 ug/L PFOS + PFHxS) (0.56 ug/L PFOA) Waste Generated 33m3 Volume Treated To Date >750 Million litres PFAS [...]

RAAF Base Williamtown Moors Drain2024-04-24T23:27:37+00:00

RAAF Base Williamtown Groundwater

2024-07-19T21:03:45+00:00

We Believe The World Needs Better Ways To Treat PFAS Opportunity Extensive environmental investigations at RAAF Base Williamtown commencing in 2014 identified per- and polyfluoroalkyl substances [...]

RAAF Base Williamtown Groundwater2024-07-19T21:03:45+00:00

Full-scale PFAS removal to non-detect for New England electronics manufacturing firm

2024-04-24T23:29:11+00:00

Project highlights and product features Client needed to upgrade two existing groundwater pump and treat systems due to lowered PFOA standard. Upgraded systems needed to reach effluent target of non-detect for [...]

Full-scale PFAS removal to non-detect for New England electronics manufacturing firm2024-04-24T23:29:11+00:00

Full-scale treatment of 1,4-dioxane at fractured bedrock site

2024-04-24T23:30:13+00:00

Project highlights and product features Full-scale application designed to treat and reinject 80 to 100 gallons of groundwater per minute System treats a mixture of groundwater extracted from a series of [...]

Full-scale treatment of 1,4-dioxane at fractured bedrock site2024-04-24T23:30:13+00:00

Mobile treatment of 1,4-dioxane at fractured bedrock site

2024-04-24T23:30:44+00:00

Project highlights and product features Mobile treatment of chlorinated solvents and 1,4-dioxane at fractured bedrock remediation site in Massachusetts First synthetic media application for 1,4-dioxane in Massachusetts, placed in service in [...]

Mobile treatment of 1,4-dioxane at fractured bedrock site2024-04-24T23:30:44+00:00